Showing posts with label sidewalks. Show all posts
Showing posts with label sidewalks. Show all posts

Tuesday, October 28, 2008

Assorted Items of Interest

This week let’s look at several topics of interest in our town.

Trail and Sidewalk Planning
There have been questions asked recently about the new trail on the east side of North Wailes Drive. The Bicycle and Pedestrian Advisory Committee recommended the connection between the new Trailway to Spook Hill Elementary School to improve safety for school children. Using asphalt allowed for a wider path at a lower cost than the use of concrete. It also opened up the paved area for easier travel for bicyclists. The east side of the street was chosen since it keeps pedestrians from having to cross a number of streets and provides a much safer path for the elementary school students.

The next phase of this work will include painting in a crosswalk, the installation of signage, and the construction of a concrete sidewalk on school property. Additional sections of sidewalks are planned along the west side of North Wailes Dr. south of the Trailway to make a connection down to Lakeshore Drive.

SR 60 East: Lighting and Medians
City staff approached FDOT several years ago to inquire about their ability to improve street lighting on State Road 60 from 11th St to Buck Moore Road. FDOT completed that work months ago. City staff then approached FDOT about the feasibility of continuing the grass median from 11th St to the east. FDOT staff prepared a conceptual plan that is on display in the lobby of city hall. The City Commission will be asked to endorse their plan, and FDOT staff will then hold an open house to review and explain the plan to affected property owners and interested citizens.

At present this stretch of State Road 60 has an open turn lane. Motorists traveling either east or west can pull into the lane and then turn left. Unfortunately, some drivers also use this lane as an “acceleration” lane. If they want to turn left from a street, say 12th Street for example, but traffic is heavy going in that direction, drivers sometimes pull into the center lane and drive there until traffic opens up and they can move over. This is a very dangerous move.

FDOT has federal safety funds that can be used for this sort of project. The conceptual plan shows that there will be full openings at some intersections, and “directed” turns (which only allow cars to turn a certain direction) at other locations. Landscaping will be provided to enhance this area and make a very nice entryway into town from east SR 60. The median will end west of Capps Road.
Park Planning, Trees
The Parks and Community Appearance Board has been busy. The board recently heard a presentation from an arborist regarding trees in Lake Wailes Park, including the type of trees and their condition. One of the arborist’s recommendations will involve ways to relieve the stress of some large trees caused by mowing grass beneath the trees. These areas may need to be mulched.

City staff is also researching available properties in the northern areas of the city for the building of a city park. It is anticipated that recreation impact fee funds, as well as any available grant funds, would be used for this purpose.

Utility System Improvements Workshop
Every year the City Commission approves a plan that lists the capital improvements that will be needed for the next year. The plan recently adopted contains financing and expenditures for the first phase of work for the wastewater treatment plant. This work includes maintenance work for the plant, which is now twenty years old, as well as other improvements and a small expansion of capacity. There are also plans to extend a water line to connect to the new airport system and go further west on SR 60. It is anticipated that these topics will be discussed at an upcoming City Commission workshop.

Tuesday, May 20, 2008

Project Updates

Our town is buzzing with activity these days! A number of high-profile City projects and private developments are already underway, or on the drawing boards. Let’s get an update on some of the projects that have great citizen interest:
  • Street Resurfacing: This project is set to be completed by the end of June. Streets yet to be done include Polk Ave. and First Street.


  • Lake Wales Boat Ramp Renovation: The contractor has poured the concrete for the section of the ramp that will be almost entirely under water. The concrete in that section must cure for 28 days to ensure durability. Once that section is pushed into position, the second section will be poured in place. The seawall and walkway/dock will then be constructed.


  • Skatepark at Kiwanis Park: The equipment for the skatepark has been ordered and is scheduled to arrive on-site in the latter part of June. It is anticipated that the equipment will be installed no later than mid-July.


  • City Swimming Pool: When the City’s property across from the Longleaf Business Park on US 27 was sold, the City Commission took $1 million out of the sale proceeds and put it in a special account for the building of the pool. While the $1 million is adequate to build the pool, additional funds may have to be found for the locker facilities. But the most disturbing expense is the annual cost of operating and maintaining the pool. Other cities with pools report spending from $50,000 to $100.000 and more per year. With revenues shrinking, this project is now on hold.


  • Lake Belle Pumping Station: It is anticipated that this County project will be constructed in the next fiscal year, with funds contributed by the Southwest Florida Water Management District, the County, and the City. It is anticipated that the pump station will be located on an easement provided by the City. The station would be owned and operated by the County. The station would keep the lake pumped down at a relatively low level, to allow it to fill-up during periods of heavy rain. The high water would then be pumped down again, with the water flowing westward, eventually reaching the Peace Creek. The City’s contribution is budgeted in the current fiscal year and will have to be carried forward to next year’s budget.


  • Grand Hotel: The second round of proposals will soon begin for a period of 120 days. In this second round, potential proposers will receive a copy of recent studies of downtown and will meet with the Chamber of Commerce’s CRA Steering Committee.


  • Airport: The Fixed Base Operator building is now under construction, and the renovations to the north hanger building to provide housing for slightly larger aircraft are now complete.


  • Sidewalks: A portion of the recent CRA bond proceeds has been allocated for new sidewalks in several areas. Planning has just started for these sidewalks - including sections around the library, along North Wailes Drive, and on Fourth St. from Spook Hill Elementary School to the Boys and Girls Club.
Private Developments
  • New businesses around the Eagle Ridge Mall: This is a hot area for commercial development! The Hampton Inn and Suites has opened to brisk business, and another hotel is planned next to Home Depot along with two gas stations nearby. A pharmacy and a commercial center are being constructed across US 27 from the Publix center at the corner of Thompson Nursery Road.


  • SR 60: New commercial development includes a new Pizza Hut/Wing House nearing completion at the corner of SR 60 and 2nd Street; and a medical office under construction on SR 60 and 13th Street.