Last Friday I was pleased to deliver the “State of the City Annual Report” to over 100 attendees at the January luncheon of the Lake Wales Area Chamber of Commerce. The year 2008 was a banner year of accomplishment for the City. Despite a continuation of new tasks being given to the City by the state, two waves of tax reform that eliminated over $400,000 from the City budget, and fiscal constraints that started in the 2000-2001 fiscal year, a broad spectrum of accomplishments are now in place.

Let’s take a look at just a few of these achievements:

Core Services Improvements
  • Many streets have been resurfaced in the historic area of the City through the CRA bond. The debt service is paid for by CRA funds, of which the County contributes nearly half;

  • Phase One of the downtown water improvement project, providing increased water pressure and flow. One immediate impact of this project came as it enabled the build-out of the Bank of America building and the retention and expansion of a long-time legal firm in town;

  • Several key improvements in fire and police services, including a new fire pumper truck paid for in cash from fire impact fees (the first fire truck bought in cash in 30 years); the new paramedic program; new hand held radios, and the digital finger print system;

  • The start-up of the re-use water system, which takes highly treated wastewater and uses it for irrigation rather than using potable water;

  • The replacement of gas chlorine use at the City’s three water plants with liquid chlorine, a safer technology.
Services to Enhance Recreation and Education
  • Completion of three major recreation facilities: the soccer/multi-purpose complex on Hunt Brothers Road, the skatepark at Kiwanis Park, and the rehabilitated boat ramp with expanded facilities on Lake Wailes, all with grant funding for the capital expenses.
Promoting a Strong Sense of Community
  • Completion of a plan for the area around the Grand Hotel and selection of a developer;

  • City Commission approval of conduit financing for the Water’s Edge Retirement Village on First Street, which enabled the project to move forward.
Promoting a Vibrant Economy
  • The area around the mall has strong commercial development. The new Hampton Inn and Suites opened last year as did the Gates Petroleum gas station;

  • All of the buildings at the Airport have been replaced using insurance money, and the first fire hydrant system has been installed with a new well and storage tank using state grant funds. Without the construction of the fire hydrant system, the airport buildings could not have been replaced;

  • The City’s utility service area significantly expanded in the northeast area through an agreement negotiated with the County;

  • The City Commission approved a Chapter 180 plan to serve the SR 60 West area with utilities in the future:

  • A number of significant commercial/industrial properties, including the Hunt Brothers offices and packing facility, annexed into the City.
Caretakers of the Environment
  • New contract with waste hauler contains recycling incentives;

  • Partial clearing of invasive plants from 2 lake areas.
Looking ahead to next year, here are some of the key areas in which achievement is anticipated:

Core Services
  • Completion of the Southside water tower, which is being constructed near the intersection of Hunt Brothers Road and Scenic Highway. This project is needed for the continued expansion of the Longleaf Business Park and other area developments;

  • Installation of new lighting on Dr. Martin Luther King Jr. Blvd and Lincoln Avenue;

  • Completion of the resurfacing of many alleys using recycled asphalt from the re-surfacing project.
Service to Enhance Recreation and Education
  • Grand Opening of the Polk Community College J.D. Alexander Academic Center in old city hall. This project improves education, brings new business opportunities downtown, and restored an historic city landmark – all in one! The grand opening will be held on Friday, January 30 at 2 pm. Everyone is cordially invited!
Promoting a Vibrant Economy
  • The redevelopment of the Grand Hotel and the Walker Building on Lincoln Avenue are anticipated;

  • Commercial projects scheduled for completion around the mall include Holiday Inn Express, Kohl’s, Walgreen’s, and the Willowbrook Square commercial center.
The entire list of key accomplishments for 2008 and anticipated achievements for 2009 has been added to the City’s website at http://www.cityoflakewales.com/. [See "Annual Report 2008"]

Note: The next Lake Wales Area Chamber of Commerce luncheon will be held on February 20 at the First Baptist Church.

Tuesday, December 9, 2008

Update on FDOT projects

This week is a holiday grab bag of items. Let’s start with a welcome, a quick update on FDOT planned activities, and a reply to the letter in Saturday’s paper on debt.

Welcome
We were sad to see Sylvia Edwards leave last July to become the Finance Director of Sanibel. The City now welcomes our new Finance Director, Dorothy Pendergrass. Dorothy’s experience includes working as the Finance Director for the cities of Deltona, Florida and Monett, Missouri. She also has seven years’ experience as a public auditor. She has a BA in Business Administration and has held a Missouri CPA license for 13 years. Welcome, Dorothy!

Road and Street Projects
Many people are not aware that planning and maintenance responsibility for streets in our town is shared between the City, the County, and the State depending on the particular street. Most streets and alleys are the City’s responsibility. Certain streets, including Buck More Road, Burns Ave, South 9th Street (south of the railroad tracks), South 11th St, and Hunt Brothers Road are the County’s responsibility. The State, through its Department of Transportation (FDOT), is responsible for State Road(SR) 60, SR 17 (Scenic Highway), and US 27.

The FDOT 5 year Capital Improvement Program lists a number of projects in our area:

  • SR 60, construction of medians between 11th St and Capps Road: FDOT staff is planning to conduct an open house meeting with the anticipated date to be in early February. The plan for this project is available for review in the Planning and Development office at City Hall.
  • SR 60 re-surfacing projects:
    • Scenic Highway overpass to 11th Street;
    • Peace Creek to US 27
  • Scenic Highway: Two sections of Scenic Highway are scheduled for resurfacing:
    • Starr Ave. to Waverly Road; and
    • Ray Martin Rd. through downtown to Mt. Lake Cutoff Rd.
  • Scenic Highway drainage improvements are planned between Seminole and Osceola Aves. City staff is working with FDOT staff on this project.

Planning continues on the intersection at Scenic Highway and Mt. Lake Cutoff Road.

City Commissioners and staff have been involved in several of the FDOT projects (as well as the county projects) to urge those agencies to take action. For example, the construction of the traffic signal at Scenic Highway and Mt. Lake Cutoff Road has been a high priority for the City for years. This project involves funding from both the state and the county, a request for a property donation from the Mountain Lake Corporation to accommodate turn lanes in all directions, and continued monitoring by FDOT staff to determine if that intersection meets all FDOT requirements for a traffic signal.

Other Projects
Recently the City Commission approved an agreement with FDOT to provide an upgrade of the railroad crossing at South 9th Street. This railroad crossing, just south of the Whispering Ridge subdivision, crosses south 9th Street at an unusual angle. The improved crossing will have flashing lights and cross arms and will be installed by the railroad. The City and the railroad will share the annual maintenance for the crossing, with the City’s portion initially capped at $1,573 annually plus future cost adjustments.

A Reply to a letter in Saturday’s paper
A letter in Saturday’s paper again questioned debt figures and information I provided in last week’s column. All of the information provided in that column is accurate and responsive to the earlier letter. The date I used for discussing the City’s principal balance is the first reporting date after I arrived in July, 2001, and all of that debt was in place before my arrival. Again, this and other financial information is available on the City’s website, http://www.cityoflakewales.com/.

Tuesday, October 28, 2008

Assorted Items of Interest

This week let’s look at several topics of interest in our town.

Trail and Sidewalk Planning
There have been questions asked recently about the new trail on the east side of North Wailes Drive. The Bicycle and Pedestrian Advisory Committee recommended the connection between the new Trailway to Spook Hill Elementary School to improve safety for school children. Using asphalt allowed for a wider path at a lower cost than the use of concrete. It also opened up the paved area for easier travel for bicyclists. The east side of the street was chosen since it keeps pedestrians from having to cross a number of streets and provides a much safer path for the elementary school students.

The next phase of this work will include painting in a crosswalk, the installation of signage, and the construction of a concrete sidewalk on school property. Additional sections of sidewalks are planned along the west side of North Wailes Dr. south of the Trailway to make a connection down to Lakeshore Drive.

SR 60 East: Lighting and Medians
City staff approached FDOT several years ago to inquire about their ability to improve street lighting on State Road 60 from 11th St to Buck Moore Road. FDOT completed that work months ago. City staff then approached FDOT about the feasibility of continuing the grass median from 11th St to the east. FDOT staff prepared a conceptual plan that is on display in the lobby of city hall. The City Commission will be asked to endorse their plan, and FDOT staff will then hold an open house to review and explain the plan to affected property owners and interested citizens.

At present this stretch of State Road 60 has an open turn lane. Motorists traveling either east or west can pull into the lane and then turn left. Unfortunately, some drivers also use this lane as an “acceleration” lane. If they want to turn left from a street, say 12th Street for example, but traffic is heavy going in that direction, drivers sometimes pull into the center lane and drive there until traffic opens up and they can move over. This is a very dangerous move.

FDOT has federal safety funds that can be used for this sort of project. The conceptual plan shows that there will be full openings at some intersections, and “directed” turns (which only allow cars to turn a certain direction) at other locations. Landscaping will be provided to enhance this area and make a very nice entryway into town from east SR 60. The median will end west of Capps Road.
Park Planning, Trees
The Parks and Community Appearance Board has been busy. The board recently heard a presentation from an arborist regarding trees in Lake Wailes Park, including the type of trees and their condition. One of the arborist’s recommendations will involve ways to relieve the stress of some large trees caused by mowing grass beneath the trees. These areas may need to be mulched.

City staff is also researching available properties in the northern areas of the city for the building of a city park. It is anticipated that recreation impact fee funds, as well as any available grant funds, would be used for this purpose.

Utility System Improvements Workshop
Every year the City Commission approves a plan that lists the capital improvements that will be needed for the next year. The plan recently adopted contains financing and expenditures for the first phase of work for the wastewater treatment plant. This work includes maintenance work for the plant, which is now twenty years old, as well as other improvements and a small expansion of capacity. There are also plans to extend a water line to connect to the new airport system and go further west on SR 60. It is anticipated that these topics will be discussed at an upcoming City Commission workshop.

Tuesday, August 26, 2008

Another Day at the Office

Tuesday of last week was a disruptive day for most people. Tropical Storm Fay caused the schools to close, as well as many businesses and government offices. But in a sense, for most city employees it was just “another day at the office.”

I say this because our city employees know that although City Hall is closed, they will most likely be called to come in and work in bad weather, leaving their homes and families in the care of other family members. The Emergency Operations Center at the main fire station held its first meeting at 7am, with employees ready to answer 9 City phone lines forwarded to that location. From there, employees went out in the weather and cleared stormwater pipes, moved several downed tree limbs out of streets, and generally kept things moving. Luckily there was no damage, in stark contrast to what we suffered from the hurricanes four years ago.

Even so, the dedication of your city employees is remarkable. They are ready to do whatever it takes to keep our town operating. I am privileged to lead this outstanding group of men and women. Their efforts usually “fly under the radar”, and therefore often seem unappreciated. They deserve an occasional thank you for what they do especially when the going gets rough. I’m sure they would appreciate a compliment from you. So the next time you see a city employee, it would be nice to tell them that their work during the storm – as well as everyday – is appreciated.

Meetings
The summer of 2008 will soon be in the books, and September is shaping up to be another busy month. Let’s take a look at some of the things to expect next month.
  • City Commission Meetings (all held at City Hall):

    • Special meeting for continued review of the draft budget and CDBG application items: Wednesday, August 27, 6 pm;

    • Regular meeting including setting the fire assessment rates: Tuesday, September 2, 6 pm;

    • Special meeting for first reading of the millage rate and budget: Wednesday, September 3, 6 pm. Per the formula in state law for this meeting date, this year the meeting for first reading of the millage and budget could not be held on the regular Commission meeting date;

    • Regular meeting, including the final adoption of the millage rate and budget for the October 1 fiscal year: Tuesday, September 16, 6 pm.
  • Meeting to discuss Youth Recreation programs for the summer of ’09: Thursday, September 18, 6 pm, Charter Schools meeting room, corner of Central and Market Sts. downtown;

  • Airport Authority meeting to tour the Fixed Based Operator building currently under construction at the Municipal Airport: Thursday, August 28, 5:30 pm.
Report on Selected Capital improvements
  • Phase 1 water main project downtown – has begun with work on Sessoms Avenue, near the water plant. The new water main will be located on Sessoms, Wetmore, and Stuart Avenues. When completed, the street re-surfacing project will continue;

  • Street Re-surfacing - this project is scheduled for completion in October, and work will include portions of First Street, Polk Avenue, and Old Scenic Highway;

  • Phase 2 of the Trail – following the intent of the voters in the April 5, 2005 referendum, construction of the trail from Kiwanis Park to Buck Moore Road is underway. Sod installation and north-side fence construction will commence soon;

  • New Water Tower: Construction has begun on the new water tower to serve the southern portion of our utility service area;

  • New Soccer/Multi-Purpose Park on Hunt Brothers Road (between Scenic Highway and US 27): Grand Opening is scheduled for Saturday, September 13, at 10 am. Everyone is invited to see this new City park!

  • Kiwanis Park improvements:

    • A retention pond to serve the High View Drive area is being constructed in an unused area of Kiwanis Park. This work addresses a stormwater problem that has plagued this neighborhood for decades;

    • The City’s Parks and Community Appearance Board is preparing a grant application for improvements at Kiwanis Park including the re-construction of three of the baseball fields, landscaping, and a site reservation for the “Barney’s Dream” all-children’s playground.

For additional information please consult the City’s website at http://www.cityoflakewales.com/.

Saturday, August 23, 2008

Mark Your Calendar. . .

Within the next 30 days there will be two important City events! The budget process will draw to a close in anticipation of the start of the new fiscal year on October 1; and the new soccer/multi-purpose park will open on September 13.
City Budget Meeting
The draft of the City’s fiscal year ’08-09 budget was discussed at a budget workshop on Wednesday, August 20, at City Hall, and will be discussed again at a budget workshop to be held in the next week (probably either Wednesday or Thursday at 6 pm in the Commission Chambers).

The preparation of this year’s budget was particularly difficult, given the effects of two waves of tax reform and the poor condition of the economy. Despite a shrinking general fund revenue picture, there are some bright spots:
  • The draft CRA budget contains funding for a community policing effort in the Lincoln Avenue area. The effort is another facet of the revitalization of neighborhood commercial in the area. In the past 12 months there has been one new business, Massey’s Meat Store that has opened on Lincoln between C and D streets. The barber shop building a block away has been sold, and the new owners are remodeling the interior and plan to open soon. Improvements are also planned for the 2 story building at the SW corner of C and Lincoln which is owned by the CRA. When completely renovated, the building will provide 5 apartments, a police sub-station, and professional offices on the second floor;

  • Capital improvements in the draft budget include the following:

    • A modest allocation for Police Department replacement vehicles;

    • The Twin Lakes water level pump station project, to keep the water level low so that rainfall does not raise the lake level above the stormdrain system on Grove Ave;

    • Several water utility improvement projects, including Phase 2 of the downtown water main replacement, and the Southside water tower near the corner of Hunt Brothers Road and Scenic Highway; and

    • The replacement of the blue light poles on Lincoln Avenue and the installation of the standard black pole, “acorn” lens lights similar to those downtown.

Grand Opening of the New Soccer/Multi-Purpose Park
The grand opening of the new soccer/multi-purpose park on Hunt Brothers Road, between US 27 and SR 17, is scheduled for September 13 at 10:00 am. Following the ribbon cutting, the Ridge Soccer League has scheduled a game for an under-17-year-old team. The park has been in development for several years, beginning with a donation of 18 acres by Feltrim Developments, a $400,000 grant from the Polk County Board of County Commissioners, a $200,000 grant from the Florida Recreation Development Assistance Program, and a significant donation from the Breakfast Rotary Club.

The park features four soccer/multi-purpose fields, a concessions/storage building with a covered picnic area, and a parking lot. One field is lighted at this time.
City Charter
Just a quick note on the City Charter, as there seems to be some confusion expressed in a recent letter to the editor. The city charter is included with the city’s code of ordinances and appears as Part 1 of the code. The charter and the entire code is available for review at City Hall, at the public library, and on the City website at http://www.cityoflakewales.com/. The website can be viewed at one of the public access computers in the public library.

Changing the City charter requires a public referendum. City staff is not working on any proposed changes at this time.

Tuesday, August 5, 2008

Capital Project Updates

There are many projects going on in our town! Let’s get a quick update on where we are on some of the most prominent projects:
  • Proposals for the Grand Hotel – The City is soliciting proposals that are due September 24, and there continues to be interest in the building. For additional information on submitting a proposal please call Harold Gallup at City Hall;

  • 1919 Building/Hardman Hall – The contractor is completing Phase 5 and will begin work on Phase 6 of the rehabilitation work. Strategic planning is underway for the adaptive re-use of this former school building as an auditorium for cultural activities, with classrooms to be located on the side exterior walls of the second floor. A capital campaign is forthcoming, and building relationships with user groups in on-going;

  • Phase II of the Lake Wales trail, from Kiwanis Park to Buck Moore Road – Work has started on this next section of the trail, as intended by the referendum that was approved by the voters on April 5, 2005;

  • Lake Wales Skate Park, Kiwanis Park – The skate park is complete and is now open;

  • Lake Wailes Boat Ramp and handicapped accessible floating pier – This facility is complete and is now open;

  • Polk Community College campus in old City Hall – Renovations are now well underway and the facility is scheduled to open in January. Work yet to be completed includes the construction of angle parking spaces on Second Street and Tillman Avenues;

  • Soccer/Multi-Purpose Park – The concession stand is completed, the fields are growing in, and plans are underway to open this 18 acre park next month – watch for announcements!

  • Airport Improvements – The re-construction of the airport buildings is nearing completion. There are now 16 T-hangers and two larger corporate hangers that have been completed, as well as the airport’s first fire response system. The new fire system includes a new well, storage tank, and hydrants. The Fixed Base Operator (FBO) building is currently under construction with a scheduled completion date in January;

  • Street Re-surfacing – There are still several streets left to be re-surfaced, most notably First Street between Central Avenue and Wiltshire Blvd, and Polk Avenue between Scenic and First Street. The First Street section is awaiting the phase 1 downtown water line improvements (see below), which will involve an “open cut” near Sessoms and Stuart Avenues. Additional work will involve taking the “millings” from this work and spreading them in alleys to provide a better road surface. A number of intersections, as well as spot repairs, will also be completed;

  • Downtown water line improvements, phase 1: A large water main will be constructed from the Market Street water plant to Wetmore to the intersection of First Street and Stuart Avenue, with a “stub out” for a future connection to a new line to run out to SR 60 West. The contractor for this project is scheduled to begin work in the next 30 days;

  • Sewer pipe on Polk Avenue, from Lakeshore to Second Street – A contractor hired by the City is constructing a new sewer line along this route to replace an old line as part of a multi-phased project to upgrade sewer capacity in this area of the City;

  • Sewer Southside Force Main – This new sewer line provides the new development areas south of SR 60 and east of Buck More Road with City sewer service. A portion of this project – the area just north of SR 60 on Buck Moore Road – took longer than expected. The plans approved by the FDOT (Florida Department of Transportation) called for the line crossing beneath SR 60 at this intersection to be over 20 feet deep, and the “directional bore” machine ran into rocky sub-soil. The problem was resolved and the construction is now complete;

  • Elevated Water Tank –Construction on a new, elevated water tank near the intersection of Scenic Highway and Hunt Brothers Road has begun;

  • US 27 Widening – This FDOT project is scheduled for completion in June of next year. The contractor is currently ahead of schedule;

  • Lake Belle pumping station – This County project is actively being planned by County staff. They are now seeking approval for the route of the water to be disposed of from the proposed pumping operation;

  • Twin Lakes pumping station – Similar to the Lake Belle project, City staff is in the planning stages for this project. If grant funding is made available, a pump station would keep the elevation of the lake at a level which will allow for the storage of rainwater.

Tuesday, April 15, 2008

Water and Wastewater Projects

Our town’s water and wastewater utilities are the key to future development. Let’s take a quick review of some of the City’s utility projects that were recently completed, are now underway, and those that are on the drawing board:

  • Airport Water Plant: The airport has been served for years with a small well that was only capable of serving water for the restaurant and restrooms in the FBO (Fixed Based Operator) building. Until the new water-plant was completed last year, there were no fire hydrants on site. The new water plant supplies water to new fire hydrants for the fire flow in this initial phase, and will be converted to a potable well in the second phase of development. This project was needed for the reconstruction of the airport and was funded by a Florida Department of Transportation (FDOT) grant and insurance proceeds.


  • Southside Force Main: This project has been on the drawing board for years and is now underway. This new sewer line runs from the corner of Buck Moore Rd. and Sunset and goes south along Buck Moore to the south side of SR 60, and then west to Miami St. This opens up the area along the route and further east of Buck Moore for additional development. This project was funded through a line of credit arranged with Wachovia Bank, to be re-paid by wastewater impact fees.


  • Re-use Line: The Whispering Ridge subdivision will be the first residential development to have re-use water for irrigation purposes. Re-use water is non-potable, highly treated wastewater. Other developments planned for the area south of SR 60 will be able to extend this line to serve their subdivisions. This line is funded by a combination of Southwest Florida Water Management District (SWFWMD) grant funds and the Wachovia line of credit, with re-payment of the borrowed money by wastewater impact fees.


  • Downtown Water Line, Phase 1: Many of the water lines in our downtown area are undersized, reflecting engineering practices from many years ago. With the redevelopment of a number of multi-story buildings, larger water lines must be constructed and the older lines abandoned. The larger pipes are needed to bring adequate fire flow to sprinkler systems in the upper story of buildings being re-habbed. Phase 1 will run a line from the Market Street Water Plant, across First Street, south on Wetmore, and east on Stuart. This project will be funded by City Community Redevelopment Agency (CRA) funds to facilitate development in this area.


  • Downtown Water Improvements, Phase 2: This project will serve buildings on the eastside of downtown. City staff is planning to apply for a Community Development Block Grant (CDBG) for this project, which the City’s grant writer says is the only CDBG category open to the City in the next round of applications.


  • Southside Water Tower: This project will serve the Longleaf Business Park and surrounding areas. It will be funded by the recent CRA bond issue to facilitate development in that area of the CRA and adjacent areas (water impact fees will also be used for this project).


  • Wastewater Plant Improvements and expansion: The current wastewater treatment plant has a permitted capacity of treating 1.9 million gallons of sewage per day. It is presently treating about 1.2 million with outstanding commitments to serve about 1.7 million gallons per day. A few years ago the operation of the plant became more difficult, and an engineering analysis indicated that a number of operational improvements were needed. The first phase of the improvements will increase plant capacity to 2.19 million gallons per day, and the Florida Department of Environmental Protection recently issued a permit to this effect. It is anticipated that this work will be done with a loan through the State Revolving Loan Fund, a low-interest loan program that funds municipal utility projects. The final stage of funding for the first phase loan will be considered by the state in July. Construction work will be scheduled following the award of funding.
In addition, City utility staff has also completed a major re-habbing of the City’s sewer pump station at the corner of Wiltshire Blvd. and Miami St., and the reinforcement of 500 feet of sewer pipe along Wiltshire Blvd. This work was part of a larger project that included drainage improvements in the area of First Street and Wiltshire. The project was paid for by a CDBG grant and CRA funds.

These improvements come at a time when utility contractor costs are lower than they have been in years, due to the slowdown in new home construction.

Tuesday, January 15, 2008

Projects Update

The budget approved by the City Commission for the 2007-2008 fiscal year contains a number of capital projects. Let’s take a look at some of the most anticipated projects and get an update:
  • Soccer/Multi-Purpose Complex: Located on Hunt Brothers Road between US 27 and the Scenic Highway, east of the Longleaf Business Park, this complex is scheduled to open in the spring. It will have four soccer/multi-purpose fields, two of which will be lighted. It also features a concession stand/restroom/storage building, and a playground area. Uses for the complex will include youth soccer hosted by the Ridge Soccer League. This project is funded by a combination of grants from Polk County, the Florida Recreation Development Assistance Program (FRDAP), and the Breakfast Rotary Club, with City recreation impact fees. The property was donated by Feltrim Developments NA Inc, the developer of the “Mayfair” mixed-use development to be located nearby.


  • Selected street re-surfacing in the historic area of the City: A number of streets will be re-surfaced with proceeds from a bond issued by the City’s Community Re-Development Agency. The list of streets will be finalized at a special City Commission tour on Saturday, January 26, at 9 am.


  • City Swimming Pool: The City Commission set aside $1 million from the sale of the City’s property at the corner of US 27 and Hunt Brothers Road for the building of the swimming pool. Since that time City staff has been working with an investor who has expressed an interest in building the locker room area for the pool. It is anticipated that within the next two to four months a final decision will be made as to the location of the project and the schedule for completion.


  • Improvements to the Boat Ramp on Lake Wailes: This project is funded by a $50,000 FRDAP grant. The plans for the boat ramp improvements have been submitted for state approval and it is anticipated that work will begin in the next 120 days.

  • Skate Park at Kiwanis Park: This project is also funded by a $50,000 FRDAP grant. The plans are being finalized and will soon be forwarded to the State for approval.


  • Elimination of street flooding on First Street north of the railroad tracks: This project is currently underway and involves the construction of a stormwater pipe near the railroad down to Lake Worth behind the Austin Center. It is funded from a portion of the funds from a Community Development Block Grant (CDBG) and should be completed in the next four months.


  • The Southside Force Main: Construction of this long-anticipated project began last week. It involves the installation of a new sewer force main from the Wal-Mart area west along portions of Grove Ave to Miami Street, and it will divert some of the flow that goes through the piping around Lake Wailes and will serve new developments on Buck Moore Road and south of SR 60. This $2,500,000 project is funded by a line of credit to be repaid by sewer impact fees from new development.


  • The Extension of Grove Ave, from Minnesota to 11th Street: The building of this section of Grove Avenue, and the construction of a sidewalk on Marietta Avenue from Grove Avenue to SR60, were commitments requested from (and agreed to by) the developer of the nearby “Whispering Ridge” subdivision and approved by the City Commission. The road project awaits a property swap that has to be approved by a federal government agency. This section of road will complete the re-building of Grove Avenue and its extension to 9th Street that was completed several years ago with funding from a $750,000 CDBG and additional CRA funds.
With the exception of the City Swimming Pool and the possible exception of the last item, it is anticipated that all of the above projects will be completed by September 30, the last day of the City’s fiscal year.

Monday, December 31, 2007

State of the City

On January 18 I will make my annual “State of the City” presentation at the Chamber of Commerce luncheon. This event will be held at the First Baptist Church at noon.

This year’s presentation will reflect the accomplishments of the past year but will focus on what we expect in 2008. The new year has the potential to be the most rewarding year in quite some time, as a number of projects that are being planned are scheduled to come to fruition. The areas of high expectation include downtown re-development, Lincoln Ave re-development, and City capital projects.

Downtown Re-Development
There are signs of a positive momentum beginning to take shape downtown:
  • The renovation of old city hall is now well-underway, with a new branch campus of Polk Community College set to open in 2009;

  • The Bullard building at Scenic and Stuart is being re-modeled at a sizeable cost to create office and apartment lofts upstairs;

  • Tres Jolie has opened in their new location on Park Avenue with a substantial investment for its bakery, restaurant, and catering business;

  • In anticipation of their mall lease expiring, Brenda’s gifts has opened a new store on Park Avenue;

  • The Bank of America building has been sold to the 610 Corporation, a firm with holdings that include properties in downtown Winter Haven. Peterson Myers has leased the upper two floors and construction plans are being drawn. The third floor of that building has never been occupied!

  • The City and the County have agreed to waive impact fees (except City water and sewer impact fees) in a “core improvement area” that includes downtown and the Lincoln Avenue neighborhood commercial district;

  • The Chamber’s new CRA (Community Re-Development Agency) steering committee has hired Martin Vargas to do the first phase of a downtown study with a $25,000 donation from Richard Quaid, who purchased and just completed the remodeling of the north arcade. The study is scheduled for completion in February, and it is anticipated that some recommendations will be implemented immediately with CRA funds budgeted in this fiscal year;

  • The City has received title to the Grand Hotel, and proposals for its use are being solicited with a deadline of March 31.
Lincoln Avenue Neighborhood Commercial Re-Development
There is progress being made in re-developing the Lincoln Avenue Neighborhood Commercial District:
  • The first new business on Lincoln Avenue since the hurricanes is preparing to open! Massey’s Meat Market is located at 344 Lincoln Avenue, between C and D Streets;

  • The Green and Gold Foundation operates a Farmer’s Market in the vacant lot at the SE corner of Lincoln Avenue and C Street on Fridays and Saturdays;

  • The CRA has acquired the Walker Building at the SW corner of Lincoln Avenue and C Street and is working with an architect to explore re-modeling options;

  • City staff is also exploring the feasibility of building a police sub-station at the corner of Lincoln Avenue and B Street with the help of an investor who is working with the Green and Gold Foundation.
City Capital Projects
The CRA Board, consisting of the City Commissioners, recently approved a $9.5 million bond issue for capital projects. The biggest single project will be street re-surfacing, with funds also budgeted for utility projects. All funds will be spent in the CRA area, which is generally the historic area of the City and includes downtown and the Lincoln Avenue/Northwest area.