- Proposals for the Grand Hotel – The City is soliciting proposals that are due September 24, and there continues to be interest in the building. For additional information on submitting a proposal please call Harold Gallup at City Hall;
- 1919 Building/Hardman Hall – The contractor is completing Phase 5 and will begin work on Phase 6 of the rehabilitation work. Strategic planning is underway for the adaptive re-use of this former school building as an auditorium for cultural activities, with classrooms to be located on the side exterior walls of the second floor. A capital campaign is forthcoming, and building relationships with user groups in on-going;
- Phase II of the Lake Wales trail, from Kiwanis Park to Buck Moore Road – Work has started on this next section of the trail, as intended by the referendum that was approved by the voters on April 5, 2005;
- Lake Wales Skate Park, Kiwanis Park – The skate park is complete and is now open;
- Lake Wailes Boat Ramp and handicapped accessible floating pier – This facility is complete and is now open;
- Polk Community College campus in old City Hall – Renovations are now well underway and the facility is scheduled to open in January. Work yet to be completed includes the construction of angle parking spaces on Second Street and Tillman Avenues;
- Soccer/Multi-Purpose Park – The concession stand is completed, the fields are growing in, and plans are underway to open this 18 acre park next month – watch for announcements!
- Airport Improvements – The re-construction of the airport buildings is nearing completion. There are now 16 T-hangers and two larger corporate hangers that have been completed, as well as the airport’s first fire response system. The new fire system includes a new well, storage tank, and hydrants. The Fixed Base Operator (FBO) building is currently under construction with a scheduled completion date in January;
- Street Re-surfacing – There are still several streets left to be re-surfaced, most notably First Street between Central Avenue and Wiltshire Blvd, and Polk Avenue between Scenic and First Street. The First Street section is awaiting the phase 1 downtown water line improvements (see below), which will involve an “open cut” near Sessoms and Stuart Avenues. Additional work will involve taking the “millings” from this work and spreading them in alleys to provide a better road surface. A number of intersections, as well as spot repairs, will also be completed;
- Downtown water line improvements, phase 1: A large water main will be constructed from the Market Street water plant to Wetmore to the intersection of First Street and Stuart Avenue, with a “stub out” for a future connection to a new line to run out to SR 60 West. The contractor for this project is scheduled to begin work in the next 30 days;
- Sewer pipe on Polk Avenue, from Lakeshore to Second Street – A contractor hired by the City is constructing a new sewer line along this route to replace an old line as part of a multi-phased project to upgrade sewer capacity in this area of the City;
- Sewer Southside Force Main – This new sewer line provides the new development areas south of SR 60 and east of Buck More Road with City sewer service. A portion of this project – the area just north of SR 60 on Buck Moore Road – took longer than expected. The plans approved by the FDOT (Florida Department of Transportation) called for the line crossing beneath SR 60 at this intersection to be over 20 feet deep, and the “directional bore” machine ran into rocky sub-soil. The problem was resolved and the construction is now complete;
- Elevated Water Tank –Construction on a new, elevated water tank near the intersection of Scenic Highway and Hunt Brothers Road has begun;
- US 27 Widening – This FDOT project is scheduled for completion in June of next year. The contractor is currently ahead of schedule;
- Lake Belle pumping station – This County project is actively being planned by County staff. They are now seeking approval for the route of the water to be disposed of from the proposed pumping operation;
- Twin Lakes pumping station – Similar to the Lake Belle project, City staff is in the planning stages for this project. If grant funding is made available, a pump station would keep the elevation of the lake at a level which will allow for the storage of rainwater.
Showing posts with label airport. Show all posts
Showing posts with label airport. Show all posts
Tuesday, August 5, 2008
Capital Project Updates
There are many projects going on in our town! Let’s get a quick update on where we are on some of the most prominent projects: